CPI Mortars

0 kWp

Total Solar PV Capacity Installed

0 MWh

Annual Production

£ 0 k

Annual Savings (2023)

0 t/CO2e

Annual Carbon Savings

An array of solar panels at CPI Mortars in Manchester.

The Installation

Total Solar PV Capacity Installed:
370kWp

Annual Production:
240MWh

Annual Savings (2023):
£68,000

Annual Carbon Savings (t/CO2e):
56t

Inverters:
SolarEdge

Panels:
JA Solar

An array of solar panels at CPI Mortars in Manchester.

The project

We have installed 312.36kWp across 4 Dry Silo Mortar Manufacturing establishments across the UK. These sites spanned the UK, from Manchester, all the way down to Southampton.

SolarEdge technology was established to be necessary for this installation due to the nature of the sites.

The systems have seen 304MWh’s of production thus far, and this set to increase again as we have been instructed to install a 50.08kWp in the South-West of England, which we are excited to complete in April 2024.

An array of solar panels at CPI Mortars in Manchester.

I understand from the teams that Amelio has been great to work with, making their jobs much easier with all of the projects and I have found you to be very thorough and professional too. I hope we shall work with you again in the future.

E-ACT Academy Trust

Amelio Solar Energy helped us decide the optimum size Solar PV system and battery storage system. We use a large amount of electricity at certain times a day and needed battery storage to work alongside Solar panels for our holiday park facilities. The solution helps keep our peak demand lower allowing us to expand our business and reduce our bills. Finance solutions for the solar panels and battery storage were also attractive.

Entrepreneur, Holiday Park, Lincolnshire

Amelio installed a PV system at our property in June including Eddi HW heating controller, price was competitive but moreover the all round service was excellent from survey to communications and the install team were tidy, polite and helpful. Everything left as the found it and happy to have a walk round on scaffold to talk about system and install. Highly recommended and no issues in 3.5 months of operation other than slashing my electricity and hot water bills.

Scott Allan

Achieve Electricity Freedom