An array of solar panels at CPI Mortars in Manchester.

The Installation

Total Solar PV Capacity Installed:
370kWp

Annual Production:
240MWh

Annual Savings (2023):
£68,000

Annual Carbon Savings (t/CO2e):
56t

Inverters:
SolarEdge

Panels:
JA Solar

An array of solar panels at CPI Mortars in Manchester.

The project

We have installed 312.36kWp across 4 Dry Silo Mortar Manufacturing establishments across the UK. These sites spanned the UK, from Manchester, all the way down to Southampton.

SolarEdge technology was established to be necessary for this installation due to the nature of the sites.

The systems have seen 304MWh’s of production thus far, and this set to increase again as we have been instructed to install a 50.08kWp in the South-West of England, which we are excited to complete in April 2024.

An array of solar panels at CPI Mortars in Manchester.

I understand from the teams that Amelio has been great to work with, making their jobs much easier with all of the projects and I have found you to be very thorough and professional too. I hope we shall work with you again in the future.

E-ACT Academy Trust

Thank you to the Amelio team for providing us with our solar panels, inverter and battery system.

The workmanship and equipment seem good quality and reflect the sound advice given by the sales team. We now have an appropriate and balanced system to suit our property and look forward to significantly reducing our crippling electricity bills. We were also encouraged by the continual excellent supporting communications from all the staff in the company.

We have no hesitation in recommending Amelio Solar Energy should you wish to take the solar energy route!

Michael Schofield

The Amelio team provided a seamless service and worked around the tenants of the Centre. The bill and carbon savings achieved have matched and sometimes exceeded expectations.

Owner, The Pelham Centre

Achieve Electricity Freedom